2018 Fall Draw Down
October 10, 2018
FirstLight, the owner and operator of the Stevenson Dam hydroelectric power station will perform the fall drawdown of Lake Zoar for 7 days beginning on November 9. Water levels will drop by 5′ to an elevation of 98′ and return to a normal elevation of 103′ on November 16th.
Sorry, the comment form is closed at this time.