Beginning on October 18, 2025, FirstLight will conduct a drawdown of Lake Zoar at the Stevenson Dam to conduct its annual maintenance and inspection activities. The normal summer operating range of the station is from 103’-100.5’, and the drawdown will target an elevation of 98.5’. The drawdown will lower lake levels to minimum pond levels and aim to return to normal operating elevations on October 27, 2025, as river conditions allow. All homeowners are encouraged to remove structures, boatlifts, and docks from Lake Zoar to prevent ice or flood damage from occurring during the winter months.